online stopwatch

cramerjohn004
Messages : 69
Inscription : dim. févr. 10, 2019 7:09 pm

online stopwatch

Messagepar cramerjohn004 » mer. avr. 03, 2019 11:01 am

The online stopwatch is one of the simplest gadgets to operate if someone wants to control the pace of their work. The first thing to do is to separate the overall tasks into individual units that are more manageable in the long run. Once this process has been agreed then they person can start looking at turning those individual projects into units of activity for the online stopwatch. Of course there has to be a certain level of balance and reasonableness when setting the tasks that are going to be accomplished using the stopwatch. If the tasks are unrealistic then the chances of success will be severely limited. The beauty of the online stopwatch is that it is flexible enough to allow almost any combination of inputs from the person operating it. One can then try to match the unit tasks to a reasonable unit timescale. The online stopwatch will countdown to the very end of the task but in the interim there will be plenty of opportunities to check the progress of the project against the targets that have been set.

It is interesting to note that people tend to online stopwatch respond very well to shorter targets that are within their skills levels rather than going for the big shots that are outside their range. It seems that the motivational aspects of completing a task are maximized with the use of the online stopwatch to accomplish certain tasks. This type of system can only work if there is balance on the expectations of the people who are using the online stopwatch. If the targets are very unrealistic then the person will fail and feel demoralized by the whole thing. However if the targets are so simple, then they will fail to motivate them towards further action thus ensuring that they will not progress much further in the task. The person dealing with the project has to be very alert to the different aspects of the project and must ensure that they are responding appropriately to any changes in the capabilities. A demoralized worker will not be able to complete their duties with diligence. However one that believes in their potential to complete a certain task will try to live up to the expectations and might end up surprising everyone by delivering the product on time.

Revenir à « ACTIVITÉS »

Qui est en ligne ?

Utilisateurs parcourant ce forum : Aucun utilisateur inscrit et 4 invités